This elite NRL training facility was constructed in December 2017. A comprehensive roll-out of StrathAyr’s turf solutions was involved.
The facility features a 7mm gravel drainage layer beneath the surface, a lower sand layer at 100mm depth, a Reflex® Mesh layer at 160mm, a top dressing and high quality turf.